Connect with us

TOP STORIES

Hydel power generation of J&K sees a steep 16% decline | KNO

Nearly 3-5% annual fall over five years rings alarm bells

Published

on

kno news

Srinagar, Apr 28 (KNO): From 17,489 Million Units (MUs) in 2020-21 to just 14,660 MUs in 2025-26, Jammu and Kashmir in nearly past five years has recorded a decline in hydel power generation by over 16 percent—reflecting an average annual fall of nearly 3-5 percent. The official figures available with the news agency—Kashmir News Observer (KNO) revealing the power generation of J&K in MUs from 2020-21 to January 2026 states that there has been a power generation fall by 16.18 percent. The figures reveal that in the year 2020-21, J&K had generated a total of 17,489.83 MUs of power followed by 17,170.62 MUs in the year 2022-23. It also said that during the year 2023-24, Jammu and Kashmir was able to generate only 16,282.93 MUs of energy followed by 15,595.82 MUs in 2024-25. The figures further states that in the year 2025-2026: upto January-2026, J&K had generated only 14,659.92 MUs of power. Stating the source and state wise generation data from various sources including thermal, hydro, nuclear and renewable energy for 2025-26 (upto January, 2026), the official figures reveal that a total of 14,659.92 MUs from renewable sources were generated by J&K including 375.01 MUs by the small hydro projects and 14,284.91 MUs from large hydro projects. As already reported by KNO, Jammu and Kashmir has indicated that a power load requirement of up to 7 Gigawatts (GWs) by the coming five years needs to be considered in the winter season—signalling major infrastructure upgrades to avoid seasonal blackouts. The officials have conservatively trimmed the load requirement to 5 GW by the financial year 2029-30. As per the documents, the statutory body Northern Regional Power Committee (NRPC) in a joint study meeting has said that “J&K indicated that a load of 6-7GW needs to be considered in the winter season by 2029-30.” “However, on conservative side load is considered to the tune of 5 GW,” it reads. Stating the details of Northern Region states load considered in Power System Simulator for Engineering (PSSE) for 2029-2030, the committee has projected 4211 Megawatts (MWs) of Emergency Power Supply (EPS) load in J&K by 2029-2030 timeframe. Pertinently, the news agency has reported that Jammu and Kashmir was importing more than 95 percent of its electricity in the month of December. The officials earlier in the month had informed that Jammu and Kashmir is importing electricity ranging from 2900 MWs to 3100 MWs during the peak hours. It also said that during the other hours, the region is importing electricity ranging from 2400 MWs to 2800 MWs. Earlier KNO had reported that Jammu and Kashmir is likely to face a four percent Compound Annual Growth Rate (CAGR) increase in electricity requirement and six percent increase in peak electricity demand for the period of 2025-26 to 2035-36—(KNO)

Trending

TOP STORIES1 hours ago

Wild Boar menace returns to Kashmir, paddy fields ravaged | KNO

TOP STORIES1 hours ago

Day 4: No trace yet of missing Pulwama boy in Shopian | KNO

TOP STORIES1 hours ago

100-Day ‘Nasha Mukt Abhiyan’ | KNO

TOP STORIES1 hours ago

LG Saxena approves constitution of Ladakh UT Haj Committee | KNO

TOP STORIES1 hours ago

Weather to improve in J&K from tomorrow | KNO

TOP STORIES1 hours ago

Organ donation remains alarmingly rare in J&K: Doctors | KNO

TOP STORIES2 hours ago

Local heroes driving new energy in Kashmir's cricket circuit | KNO

TOP STORIES2 hours ago

SMC to launch strict action against car, bike dealers occupying roads, footpaths | KNO

TOP STORIES2 hours ago

545 village revenue records missing in J&K; 258 still untraced | KNO

TOP STORIES3 hours ago

J&K Govt clears 18% transport fare hike across UT | KNO

TOP STORIES3 hours ago

296 peddlers arrested, 281 cases registered in Kashmir under 100-day anti-drug drive | KNO

TOP STORIES3 hours ago

Vaishnaw to flag off Jammu–Srinagar Vande Bharat tomorrow | KNO

TOP STORIES4 hours ago

Take strict action against individuals, OGWs harbouring terrorists: LG Sinha directs security agencies | KNO

TOP STORIES4 hours ago

Finance Dept pushes prepaid meter installation Govt offices, PSUs, universities | KNO

TOP STORIES14 hours ago

SMC to auction 28 shops, 2 halls at Parimpora online on May 22, 23 | KNO

TOP STORIES15 hours ago

EOW files case after man allegedly duped, sent to Cambodia in fake job scam | KNO

TOP STORIES15 hours ago

Batmaloo women block road over water shortage, seek immediate restoration of supply | KNO

Copyright © 2021